SIDNEY, B.C.
BC FERRY SERVICES INC.
Vancouver Pile Driving (VanPile) delivered an award-winning design-build solution for Swartz Bay Berth 2 by replacing traditional deep foundations with a floating berth system. The innovative approach reduced costs and schedule impacts while allowing the terminal to remain fully operational throughout construction.
© Copyright 2025 Carlson Construction Group. All Rights Reserved.