LADNER B.C.
VANCOUVER FRASER PORT AUTHORITY
VanPile completed maintenance dredging of a secondary channel in Ladner, B.C., removing 160,000 m3 of material over a 2.5 km stretch. The project required careful coordination with local vessel traffic and private owners to maintain safe operations in this active waterway.
© Copyright 2025 Carlson Construction Group. All Rights Reserved.