NORTH VANCOUVER, B.C.
G3 TERMINAL VANCOUVER (G3)
Carlson Construction Group’s marine division, Vancouver Pile Driving (VanPile), contributed to the expansion of the G3 Terminal on the north shore of Burrard Inlet, enabling increased bulk shipment capacity and optimizing grain receiving, storage, and shipping operations on Canada’s west coast.
© Copyright 2025 Carlson Construction Group. All Rights Reserved.