VanPile was contracted to upgrade the BC Ferries Deas FMU terminal in the Deas Basin, a key facility for vessel repairs. The scope included dolphin replacements, structural concrete work, and shoreline sheet pile repairs – delivered with minimal disruption to operational berths.
© Copyright 2025 Carlson Construction Group. All Rights Reserved.