Marine Facilities Construction Services | Vancouver Pile Driving
Marine Facilities
As part of the Vancouver Centerm Expansion Project, VanPile executed major marine-based ground improvement works to support the terminal’s increased capacity and expanded footprint. The upgrade boost Centerm’s handling capacity by two-thirds, improving port efficiency and goods movement across the south shore.
Vancouver Pile Driving (VanPile) was selected to complete key marine and upland upgrades at the Canadian Coast Guard base in Victoria, B.C. The project included the installation of a concrete float, vehicle ramp, and wave fence, along with significant civil, mechanical, and electrical improvements to support ongoing marine operations.
In Burnaby, B.C., Vancouver Pile Driving (VanPile) upgraded the aging Shell fuel terminal infrastructure by replacing deteriorated timber dolphins with new steel and concrete berthing structures all while maintaining full operational capacity at the active dock.
Vancouver Pile Driving (VanPile), a Carlson Construction Group company, completed the construction of a new Marine Terminal on the South Arm of the Fraser River, integrating advanced mooring and offloading systems to accommodate both barge shipments and Panamax-class vessels.
Carlson Construction Group’s marine division, Vancouver Pile Driving (VanPile), contributed to the expansion of the G3 Terminal on the north shore of Burrard Inlet, enabling increased bulk shipment capacity and optimizing grain receiving, storage, and shipping operations on Canada’s west coast.
Carlson Construction Group’s business unit, Vancouver Pile Driving (VanPile), played a key role in the transformational upgrade of the Viterra Pacific Terminal in Vancouver, helping triple its handling capacity and establish it as one of the most efficient and versatile port terminals in Canada.
CONTACT US
Fill out the form to be connected with our team.