REPLACE DOLPHINS AND LIFE EXTEND SHEET PILE WALL (FMU)
VanPile was contracted to upgrade the BC Ferries Deas FMU terminal in the Deas Basin, a key facility for vessel repairs.
VanPile was contracted to upgrade the BC Ferries Deas FMU terminal in the Deas Basin, a key facility for vessel repairs.
Due to the close proximity of adjacent structures and a high water table, the replacement of underground fuel tanks required a secure excavation solution. VanPile was contracted to furnish and install a sheet pile cofferdam to enable safe installation of the new tanks while maintaining structural stability and groundwater control.
To support the development of a proposed Sales Centre at Nexen Beach, ground improvement was required to mitigate seismic risks associated with liquefaction and lateral spreading of foreshore soils.
VP Foundations was contracted to perform land-based foundation piling inside Neptune Terminals, an active coal and potash export facility undergoing upgrades to its ship loading and conveyor systems.
Brymark Installations Group was contracted to supply and install piping systems across multiple critical zones of the new DP World Canola Export Facility.
Brymark Installations Group was contracted to supply and install piping systems across multiple critical zones of the new DP World Canola Export Facility.
As part of an $800 million facility upgrade, Brymark Installations Group was responsible for the preassembly and installation of complex bulk handling systems.
The South Fraser Perimeter Road (SFPR) is a 40 km, four-lane corridor improving goods movement and easing congestion in Metro Vancouver.
As part of the Vancouver International Airport’s West Apron expansion, Brymark Installations Group was selected to install critical components of the upgraded fuel delivery system.