PACIFIC COAST TERMINALS – RAILCAR DUMPER SHUTDOWN 2020 PROJECT

Brymark Installations Group was awarded the contract to complete annual maintenance work and structural upgrades on Pacific Coast Terminals' (PCT) Railcar Dumper. The scope included concrete restoration, structural scanning, and protective protective coating application to ensure ongoing performance and reliability of critical material handling infrastructure.

Continue ReadingPACIFIC COAST TERMINALS – RAILCAR DUMPER SHUTDOWN 2020 PROJECT

DP WORLD CANOLA OIL TRANSLOAD FACILITY

As part of the Vancouver Centerm Expansion Project, VanPile executed major marine-based ground improvement works to support the terminal's increased capacity and expanded footprint. The upgrade boost Centerm's handling capacity by two-thirds, improving port efficiency and goods movement across the south shore.

Continue ReadingDP WORLD CANOLA OIL TRANSLOAD FACILITY

CENTERM EXPANSION PROJECT – DENSIFICATION AND CAISSONS

As part of the Vancouver Centerm Expansion Project, VanPile executed major marine-based ground improvement works to support the terminal's increased capacity and expanded footprint. The upgrade boost Centerm's handling capacity by two-thirds, improving port efficiency and goods movement across the south shore.

Continue ReadingCENTERM EXPANSION PROJECT – DENSIFICATION AND CAISSONS

MARY RIVER EXPANSION STAGE 3 – FREIGHT DOCK

To support the expansion of the Mary River Mine in Nunavut, VanPile and its joint venture partner delivered a custom-designed, temporary offloading dock in one of Canada's most remote arctic locations. The dock enabled efficient ship-to-shore transfer of heavy prefabricated modules during the short summer shipping window.

Continue ReadingMARY RIVER EXPANSION STAGE 3 – FREIGHT DOCK