CARBON ENGINEERING – NEUTRALIZATION SYSTEM OPS044 PROJECT

Brymark Installations Group was awarded the contract for the construction of Carbon Engineering's Neutralization System OPS044. Due to a confidentiality agreement with the client, project specifics are limited. However, the work involved complex mechanical and piping installation within an active facility.

Continue ReadingCARBON ENGINEERING – NEUTRALIZATION SYSTEM OPS044 PROJECT

STERLING INDUSTRIES, LLC – GAF EQUIPMENT DECOMMISSIONING AND REMOVALS

Brymark Installations Group was contracted to safely dismantle and remove two Butyl production lines at the FT Synthetics plant in Langley, B.C. The complex scope involved disassembling, packing, and transporting large-scale industrial equipment for reinstallation in Indiana, USA.

Continue ReadingSTERLING INDUSTRIES, LLC – GAF EQUIPMENT DECOMMISSIONING AND REMOVALS

NEW GOLD – NEW AFTON MINE’S CENTRAL VALVE STATION PROJECT

Brymark Installations Group was contracted to fabricate, install, and commission a new Central Valve Station (CVS) at the crest of the New Afton Tailings Storage Facility. The project included modular construction, integration of owner-supplied components, and full commissioning at the remote mine site.

Continue ReadingNEW GOLD – NEW AFTON MINE’S CENTRAL VALVE STATION PROJECT

7-ELEVEN PETROCAN FUEL TANK REPLACEMENT

Due to the close proximity of adjacent structures and a high water table, the replacement of underground fuel tanks required a secure excavation solution. VanPile was contracted to furnish and install a sheet pile cofferdam to enable safe installation of the new tanks while maintaining structural stability and groundwater control.

Continue Reading7-ELEVEN PETROCAN FUEL TANK REPLACEMENT